My lack of updates have stemd from a complated track plan, thoughts into turnouts and turnout control and a want to switch from code 80 to code 55. The freelanced BNSF route I planed just wasent what I want. My passion is unit trains and to be more exact, coal unit trains. Also i want to allow for multipul loop runing of trains. Most of the time i will be the only one useing the layout so this will alow me to have some traffic in the way. Trees for the kirtland route where another issue, i would need far to many. so to cut the cost of trees an open plains area would be idea. with all this i decided apon the famous Power river. 4 track main, open fields, rolling hills, lots of trains running and coal.
No comments:
Post a Comment